20 Oz. Aluminum Tundra Bike Bottle - 5701 | SpectrumAdvertising Embroidery | Screen Printing | Promotional | 877-500-0061

20 Oz. Aluminum Tundra Bike Bottle
#5701

Pricing Details

Production Time: 10 Working Days
QuantityPrice
36 $4.88 each
72 $4.24 each
144 $3.69 each
288 $3.21 each
576 $2.79 each
  • Screw On, Spill-Resistant Lid
  • Meets FDA Requirements
  • BPA Free
  • Split Ring Attachment
  • Hand Wash Recommended
• Screw On, Spill-Resistant Lid
• Split Ring Attachment
• Meets FDA Requirements
• BPA Free
• Hand Wash Recommended

Normal Production Time
10 Working Days

Product Size
8 1/4" H

Additional Information
COLORS AVAILABLE
Metallic: White, Black, Purple, Silver, Blue, Red, Green or Orange all with Black Lid.

IMPRINT AREA AND METHOD
Silk-Screen: 2 ½" W x 3" H • Wraparound: 6" W x 3" H (Silk-Screen Only) See General Information For Details On Wraparound Imprint.
Optional 4-Color Process: Standard: 3 ¾" W x 3" H • Large: 5 ¾" W x 3" H (Must Specify on PO)
Optional Carabiner Imprint: 1" W x 1/8" H

IMPRINT COLORS
Standard Silk-Screen Colors or 4-Color Process Imprint on One Side. Standard Pricing Includes One Color Imprint In One Location.

SET UP CHARGE
Silk-Screen: $40.00(G) per color, per side. $25.00(G) on re-orders. • 4-Color Process: $95.00(G). $50.00(G) on re-orders.

MULTI-COLOR IMPRINT
Silk-Screen: Add .30(G) per extra color, per piece. (2 Color Maximum) • 4-Color Process: Standard: Add .79(G) per piece. • Large: Add .99(G) per piece. (includes full color imprint up to maximum imprint size)

SECOND SIDE IMPRINT
Silk-Screen: Add .30(G) per piece. (1 Color Only)

PACKAGING
Poly Bag, 36 per carton. (Must be ordered in full carton quantities).

OPTIONAL CARABINER
Add .75(C) per piece.
For Laser Engraving on Carabiner: Add $45.00(G) set up charge, $25.00(G) on re-orders, plus an additional .25(C) per piece. Laser Engraves White. Carabiner available in Silver, Blue, Red, Black, Green or Purple. (Must specify on PO) Carabiner ships unattached.

PLEASE NOTE
Production time for 4-Color Process Imprint is 12 to 15 days after proof approval.